Cubic yards and bags for any slab, footing, post, wall or steps, with the math shown.

The slab is yours: it changes as you type your sizes below.

1.5 yd362 × 80 lb bags10 ft10 ft4 in

What are you pouring?

Enter your measurements

Part 1: Slab

Rectangular slab
Length

= 10 ft

Width

= 10 ft

= 4 in

10 ft10 ft4 in
33.33 ft³ of concrete
10%

Default for this shape: 10%.

Compare bags vs. a truck

Optional. Enter prices from your local store and supplier.

Bagged concrete

62 × 80 lb bagsEnter a price

Ready-mix truck

1.5 yd³Enter prices

A 10 ft × 10 ft slab at 4 in needs 1.23 cubic yards, or about 62 80-lb bags with 10% extra. Order 1.5 cubic yards.

Your order, as a pile

That's 62 × 80 lb bags, 4,960 lb to lift.

Or 1 ready-mix truck, filled to 15% of 10 yd³ each.

Compare the cost of bags and a truck

Every shape, one project

Pick a shape for each part of the pour and add as many parts as you need. A patio with steps and a cut-out around a tree is three parts, and one order.

Show a shape

A 10 ft × 10 ft slab at 4 in needs 1.23 cubic yards, or about 62 80-lb bags with 10% extra. Order 1.5 cubic yards. Open the slab calculator

A 12 in × 4 ft round column needs 0.12 cubic yards, or about 6 80-lb bags with 5% extra. Order 0.25 cubic yards. Open the Sonotube calculator

A 12 in × 2 ft 6 in post hole needs 0.05 cubic yards, or about 3 80-lb bags with 10% extra. Order 0.25 cubic yards. Open the fence post calculator

A strip footing needs 1.32 cubic yards, or about 66 80-lb bags with 10% extra. Order 1.5 cubic yards. Open the footing calculator

A 20 ft × 8 ft wall at 8 in needs 3.95 cubic yards, or about 187 80-lb bags with 5% extra. Order 4.25 cubic yards. Open the wall calculator

A 3-step stairs, 3 ft wide needs 0.36 cubic yards, or about 17 80-lb bags with 5% extra. Order 0.5 cubic yards. Open the steps calculator

Also round and triangular slabs, slabs with a thickened edge, square columns, hollow rings, pad and bell footings, curb and gutter, and any slab you know the area of.

Common slab sizes

9 sizes at 4 in, with 10% extra

Select a size for 5 and 6 in, the bag count for every bag size, and the drawing.

How a pour goes

Six steps from tape measure to hard concrete. The calculator does its part in the first three; open a step for what to check.

Measure
  • Measure length and width at the inside faces of the forms, where the concrete will actually go.
  • Measure the thickness of the concrete only. Don't include the gravel base underneath.
  • If the ground isn't level, take the depth in several places, use the average, and keep the extra at 10% or more.

Type dimensions the way you measured them: 10' 6", 10.5, 3 1/2 or 90 cm. The line under each field shows how the calculator read it. How to measure

Workers laying a concrete foundation between streetcar rails on a dirt road
Streetcar track foundation, Edmonton, 1913. Byron-May Company, public domain.
Form

Set the forms, then measure again inside them. That is the size to type in, not the size of the hole.

Break odd shapes into rectangles, circles and triangles and add each as a part. Subtract anything that won't be concrete, like a cut-out around a tree.

Tall wall forms braced with timber on a construction site
Wall forms on a New York rail project, 2018. MTA Capital Construction, CC BY 2.0.
Order
  • The NRMCA suggests ordering 4% to 10% more than you measured. Running short mid-pour is worse than a little left over.
  • One cubic yard is 45 80-lb bags, each mixed by hand or in a mixer.
  • 45 80-lb bags weigh 3,600 lb. Enter your vehicle's payload under "More details" to count trips.
Stacked paper bags of portland cement on a pallet
Bags of portland cement. KVDP, public domain.
Pour

Trucks carry 8 to 12 cubic yards (NRMCA), and small orders can come with extra fees. Ask the supplier, then enter the fees in step 3 to compare.

"Copy order message" gives you a ready-to-send note with the quantity, so nothing gets lost on the phone. Bags or ready-mix?

A crew pouring a concrete sidewalk along a city street of brick buildings
Sidewalk on Adelaide Street, Toronto, 1899. F. W. Micklethwaite, public domain.
Finish

Thickness moves the order more than anything else: going from 4 in to 5 in adds a quarter more concrete, and 6 in adds half. How thick should a slab be?

Workers troweling the surface of a freshly poured concrete walk
Finishing a new walk, 2009. U.S. Navy, public domain.
Cure

Heat, cold and wind change how fresh concrete sets. Read hot and cold weather pouring and check the forecast before you book the truck.

A bronze contractor's plate set into an old concrete sidewalk
A contractor's plate still set in a Cambridge, Massachusetts, sidewalk. Daderot, CC0.

Show the math

Length × width × thickness, in feet, ÷ 27 = cubic yards.

The calculator converts every dimension to feet, works out the volume, and divides by 27. Then it adds your extra, rounds the order up to the supplier's increment, and divides by each bag's published yield, rounding up to whole bags.

The default 10 × 10 ft slab at 4 in is 1.23 cubic yards, so you'd order 1.5 yd³ or buy 62 80-lb bags. Open "Show the math" under any result for your own numbers.

Slab

  1. Length: 10 ft
  2. Width: 10 ft
  3. Thickness: 4 in ÷ 12 = 0.3333 ft
  4. Area: 10 ft × 10 ft = 100 ft²
  5. Volume: 100 ft² × 0.3333 ft = 33.3333 ft³

Total and order

  1. In cubic yards: 33.3333 ft³ ÷ 27 = 1.2346 yd³
  2. With 10% extra: 1.2346 yd³ × 1.1 = 1.358 yd³
  3. Order, rounded up to the next 0.25 yd³: 1.5 yd³

Bags (with extra)

  1. 40 lb bags: 36.6667 ft³ ÷ 0.3 ft³ per bag = 122.2222, rounded up to 123
  2. 50 lb bags: 36.6667 ft³ ÷ 0.375 ft³ per bag = 97.7778, rounded up to 98
  3. 60 lb bags: 36.6667 ft³ ÷ 0.45 ft³ per bag = 81.4815, rounded up to 82
  4. 80 lb bags: 36.6667 ft³ ÷ 0.6 ft³ per bag = 61.1111, rounded up to 62

Trucks and weight

  1. Trucks: 1.5 yd³ ÷ 10 yd³ per truck = 0.15, rounded up to 1
  2. Weight of the poured concrete: 1.1468 m³ × 2,400 kg/m³ = 2,752 kg = 6,068 lb

Questions people ask

Short answers, worked out by the same calculator. How we calculate has the full method.

How much concrete do I need for a 10 × 10 slab?

A 10 × 10 ft slab 4 in thick is 1.23 cubic yards. With 10% extra, order 1.5 cubic yards from a ready-mix supplier, or buy about 62 80-lb bags (82 60-lb bags).

How many bags of concrete make a cubic yard?

It takes 45 80-lb bags, 60 60-lb bags, 72 50-lb bags or 90 40-lb bags to make one cubic yard, based on the yields printed on QUIKRETE's data sheet (0.60 ft³ per 80-lb bag). Add your waste allowance on top.

How much extra concrete should I order?

The National Ready Mixed Concrete Association suggests ordering 4% to 10% more than the volume you measured, to cover uneven ground, form bulges and spillage. The calculator defaults to 10% for slabs, footings and post holes, and 5% for formed shapes like columns and walls. You can change it with the slider.

Should I use bags or a ready-mix truck?

It depends mostly on volume. One cubic yard is 45 80-lb bags, which is a lot of mixing. Ready-mix trucks carry 8 to 12 cubic yards, according to the NRMCA. Enter your local prices in the calculator to compare the two costs for your project.

How thick should a concrete slab be?

The International Residential Code sets 3½ in as the minimum for slab-on-ground floors, and bagged-mix instructions for slabs commonly call for at least 4 in. Check local code and your project's loads, and ask a professional for anything structural.

How much does a cubic yard of concrete weigh?

About 4,045 lb (2.02 tons) at 2,400 kg/m³ (about 150 lb/ft³), the upper end of the 140 to 150 lb/ft³ range the NRMCA gives for normal-weight concrete. QUIKRETE gives about 140 lb/ft³ for its bagged mix, which works out to 3,780 lb per cubic yard.

How do I convert cubic feet to cubic yards?

Divide by 27, because a cubic yard is 3 ft × 3 ft × 3 ft. For example, a 10 × 10 ft slab at 4 in is 33.33 ft³, and 33.33 ÷ 27 = 1.23 yd³.